← all games

Power Grid Deluxe: Europe/North America

#155873BGG ↗

2014 · 2-6 players · 120min · weight 3.20 · 4,641 ratings

v2 v3 fit 0.307

BGG raw

ID
155873
Name
Power Grid Deluxe: Europe/North America
Year
2014
Rank
159
Min players
2
Max players
6
Playing time
120
Min playtime
120
Max playtime
120
Avg weight
3.2013
Num weights
154
Bayes avg
7.09906
Average
7.94225
Users rated
4641
Num owned
7694
Wanting
250
Wishing
1264
Num comments
779
Fetched at
Sat Apr 25 2026 16:15:33 GMT+0000 (Coordinated Universal Time)
Mechanisms (6)
Auction: Turn Order Until PassCatch the LeaderIncomeMarketNetwork and Route BuildingTurn Order: Stat-Based
Categories (2)
EconomicIndustry / Manufacturing
Description (1825 chars)

Power Grid deluxe: Europe/North America is a standalone game in the Power Grid universe. For the expansion to regular Power Grid see Power Grid: Europe/North America. For the 10th anniversary of the highly successful game Power Grid we present this new deluxe version including brand new components. Wait for a huge double-sided game board presenting Europe and North America, newly customized wooden parts and an entire deck of new power plants, some of which use natural gas instead of garbage. New overview cards for the resource refill improve game play. An exciting new two players experience is also added - “Against the Trust”! The game is still Power Grid, with all the exciting auctions, the nerve-wracking resource speculations, city networks and the competition among the players, all the way to the tight game ending with several players fighting for the win. The goal of Power Grid Deluxe is to supply the most cities with power when someone's network reaches a predetermined size. Players mark pre-existing routes between cities for connection, then bid against each other to purchase the power plants that they need to power these cities. However, as power plants are purchased, newer, more efficient plants become available, so by merely purchasing, you're potentially allowing others access to superior equipment. What's more, players must acquire the resources (coal, oil, natural gas, and uranium) needed to power said plants (except for the "renewable" windfarm plants, which require no fuel), making it a constant struggle to upgrade your plants for maximum efficiency while still retaining enough wealth to quickly expand your network to get the cheapest routes. NOTE: The deluxe edition came with Power Grid: The New Power Plants – Set 2, which was later released separately in 2021.

LLM v2 (wide)

Core verb
auction plant, buy resources, connect
Decision shape
combinatorial
Reward schedule
engine_compounding
Aesthetics
["Challenge"]
Core loop pitch
Auction power plants, buy fuel from a market, build city connections, then power as many cities as you can.
Translation difficulty
Medium
Difficulty reason
Now has an official digital port on Steam; multi-phase market with reverse turn order is mathy but works on screen with good pacing.
Direct digital port
Power Grid (Steam, Rio Grande / Giant Roc)
Port kind
first_party
Closest loop translation
none yet
Primitive tags
["reverse_turn_order_catchup", "commodity_market_squeeze", "ascending_plant_auction", "network_route_cost", "step_phase_acceleration", "elastic_resource_pricing"]
Confidence
1
Extracted at
Mon Apr 27 2026 11:40:03 GMT+0000 (Coordinated Universal Time)
Raw v2 JSON (943 chars)
{
  "game_id": 155873,
  "name": "Power Grid Deluxe: Europe/North America",
  "core_verb": "auction plant, buy resources, connect",
  "decision_shape": "combinatorial",
  "reward_schedule": "engine_compounding",
  "aesthetics": [
    "Challenge"
  ],
  "core_loop_pitch": "Auction power plants, buy fuel from a market, build city connections, then power as many cities as you can.",
  "mobile_translation_difficulty": "Medium",
  "translation_difficulty_reason": "Now has an official digital port on Steam; multi-phase market with reverse turn order is mathy but works on screen with good pacing.",
  "direct_digital_port": "Power Grid (Steam, Rio Grande / Giant Roc)",
  "closest_loop_translation": "none yet",
  "primitive_tags": [
    "reverse_turn_order_catchup",
    "commodity_market_squeeze",
    "ascending_plant_auction",
    "network_route_cost",
    "step_phase_acceleration",
    "elastic_resource_pricing"
  ],
  "confidence": 1
}

LLM v3 (deep)

Not yet enriched at v3 (deep pass).